top of page

Mazda of Bedford, Ohio

Bedford Heights, Ohio

A new dealership for Mazda included a second floor with an attached carwash. Parking lot lighting with photometrics was provided for building department review. We used the Mazda design manual as our basis of design to provide electrical engineering that included lighting, lighting controls, new general-purpose receptacles, and specific power requirements for miscellaneous equipment. Electrical design included providing for the power requirements of the various items of HVAC equipment and controls. Since this was a new building on a green site, Tec coordinated the electric utility requirements for power, communication, and data services. The technology design included layout of voice and data pathways, as well as fire alarm system design.

2018

Year Completed

$26,700

Cost

18,000 SF

Size