top of page

Bishop Ready High School HVAC Renovation

Columbus, OH

This project’s design was based on the recommendations of a study of the existing HVAC systems of this High School in Columbus, Ohio. Construction took place in 2 phases in the following areas: a 2 story classroom wing, a science classroom wing, a single story classroom wing, and several conference and break room areas. In the 2-story classroom wing, the existing heating hot water unit ventilator system was replaced with an all-electric VRF (Variable Refrigerant Flow) system. The existing heating hot water pipes that were not accessible were abandoned in place. Code-required ventilation was designed to be mechanical ventilation but was changed to natural ventilation by the owner to reduce construction costs. The work in the science wing was comprised of replacing the existing rooftop multi zone unit (hot water heating, DX cooling) with new single zone, constant volume rooftop units (gas heating, DX cooling). The existing heating hot water unit ventilator system in the single story classroom wing was replaced with new single zone, constant volume rooftop units (gas heating, DX cooling). The conference and break room areas received new heating and cooling with all electric single zone split systems. To serve the new HVAC loads, a new 800 amp, 480 volt, 3 phase electric service was added to supplement the existing 1200-amp, 208 volt, 3 phase electrical service.

2025

Year Completed

$2.6 M

Cost

95,000 SD

Size

Contact Us.

Tec Inc. Engineering & Design
33851 Curtis Blvd., Suite 216
Eastlake, OH 44095

Phone: (440) 953-8760

Email: info@tecinceng.com

Serving Clients Throughout Ohio
& the US. With offices in

Cleveland
Columbus

Pittsburgh

Follow Us.

  • facebook
  • instagram
  • linkedin

Newsletter Signup.
Stay connected with news, projects, and industry insights.

©2025 by Tec, Inc. Engineering & Design. 

bottom of page