top of page

Appalachian Behavioral Health

Athens, Ohio

This project replaced the existing two dual fuel 3,313 MBH boilers which served the entire building’s heating needs. The new boilers were sized to serve the entire Hospital load as it currently existed and incorporated an N+1 redundancy scheme to enhance reliability. A primary/secondary heating water piping system was equipped with VFD control of all pumps to improve energy efficiency by reducing pump energy use. Timing was critical and this design was completed on a fast-track to ensure heat was available for the 2017/2018 heating season. This is a 24 hour a day facility so the system had to be operational when heat was needed.

2017

Year Completed

$304,400

Cost

Boilers

Size

Contact Us.

Tec Inc. Engineering & Design
33851 Curtis Blvd., Suite 216
Eastlake, OH 44095

Phone: (440) 953-8760

Email: info@tecinceng.com

Serving Clients Throughout Ohio
& the US. With offices in

Cleveland
Columbus

Pittsburgh

Follow Us.

  • facebook
  • instagram
  • linkedin

Newsletter Signup.
Stay connected with news, projects, and industry insights.

©2025 by Tec, Inc. Engineering & Design. 

bottom of page