Parma Hyperbaric Chamber, University Hospitals
Parma, Ohio
University Hospitals hired the design team to convert an existing vacant former Sleep Lab space into a three chamber Hyperbaric Chamber suite. The floor plan included an existing toilet room which remained, two new changing rooms and an existing shower was removed. Oxygen and medical gas service was extended from the existing system main in the building, with a new zone valve and alarm. The determination and location of these services were coordinated with UH Facility personnel.
2019
Year Completed
$14,600
Cost
1 Chamber
Size