Parker Aerospace

Mentor, Ohio

An existing warehouse was renovated into Parker Aerospace Gas Turbine Fuel Systems’ new headquarters which included explosion-proof and hazardous materials rooms. The space was divided into 27,000 SF of laboratory space, 40,000 SF of office space, and 65,000 SF of machine/shop space.

Tec designed new power distribution, lighting, and site utilities including new electrical service to the building. The design incorporated a custom cable tray system to run all utilities—electrical, HVAC ductwork, argon, compressed air, and chilled water— above the lab. Utilizing a one-team approach, the engineers and architect worked with the owner to establish the best locations for all equipment and coordinate the utilities serving the equipment.

2017

Year Completed

Private

Cost

132,000 SF

Size