top of page

Robbins Building Plant Lab, Case Western Reserve University

Cleveland, Ohio

Case Western Reserve University’s Robbins Building was in need of an update. The University chose to renovate the 1st and 2nd floors using the DIRIT wall system. Integrated monitors, power and technology resulted in a unique 38’ linear wall have isolated the entry and created a secure entry for the 1st floor. The 2nd floor has a new conference room created by converting 1,200 sq. ft. of existing office space.

2012

Year Completed

$1.8 million

Cost

500 SF

Size

Contact Us.

Tec Inc. Engineering & Design
33851 Curtis Blvd., Suite 216
Eastlake, OH 44095

Phone: (440) 953-8760

Email: info@tecinceng.com

Serving Clients Throughout Ohio
& the US. With offices in

Cleveland
Columbus

Pittsburgh

Follow Us.

  • facebook
  • instagram
  • linkedin

Newsletter Signup.
Stay connected with news, projects, and industry insights.

©2025 by Tec, Inc. Engineering & Design. 

bottom of page