top of page

Kovacic Recreation Center, The City of Cleveland

Cleveland, Ohio

In 2017 the City of Cleveland began implementing a city-wide recreation Master plan that included the improvements to multiple recreation centers. The Kovacic Recreation center, formerly known as the St. Clair Bath House, built in 1919, was one of the largest renovation projects of this plan. Tec provided mechanical, electrical, plumbing and fire protection engineering, lighting and technology design for an extensive renovation to improve accessibility and life safety to make the center warm, safe and dry for users and staff.

The recreation center improvements included accessibility and ADA improvements as well as overall HVAC, lighting and electrical upgrades to bring the building up to code and increase energy efficiency. The scope included improvements to the entire facility which housed an indoor pool, gym, weight room, activity rooms, and administrative offices.

2019

Year Completed

$4,300,000

Cost

28,000 SF

Size

Contact Us.

Tec Inc. Engineering & Design
33851 Curtis Blvd., Suite 216
Eastlake, OH 44095

Phone: (440) 953-8760

Email: info@tecinceng.com

Serving Clients Throughout Ohio
& the US. With offices in

Cleveland
Columbus

Pittsburgh

Follow Us.

  • facebook
  • instagram
  • linkedin

Newsletter Signup.
Stay connected with news, projects, and industry insights.

©2025 by Tec, Inc. Engineering & Design. 

bottom of page