top of page

The project encompasses an 8,500 square foot, single-story, renovation of an existing restaurant space. The new space for Bar Italia restaurant included a full kitchen, bar, lobby, and seating area.

Mechanical Engineering included reconfiguration, modification and additions to the existing HVAC system branch ductwork and diffusers for the renovated space. Supplemental interior equipment such as fans and additional make-up air units may were designed to accommodate the new space configuration and use of the space.

Electrical Engineering included new lighting systems throughout, emergency lighting and lighting controls to accommodate the new space configuration. General power devices and branch circuit wiring within the space were modified to accommodate the new space configuration. We used the existing 1200-amp, 120/208 volt electrical service and main panel located on the mezzanine for the renovation.

Plumbing Engineering included design of modifications to the existing water, sanitary, storm and venting systems to accommodate the relocated or expanded restroom, kitchen, and plumbing facilities. A fire protection performance specification was prepared to relocate existing sprinkler heads to accommodate the new space configuration.

Winter Park, FL

The project encompasses an 8,500 square foot, single-story, renovation of an existing restaurant space. The new space for Bar Italia restaurant included a full kitchen, bar, lobby, and seating area.

Mechanical Engineering included reconfiguration, modification and additions to the existing HVAC system branch ductwork and diffusers for the renovated space. Supplemental interior equipment such as fans and additional make-up air units may were designed to accommodate the new space configuration and use of the space.

Electrical Engineering included new lighting systems throughout, emergency lighting and lighting controls to accommodate the new space configuration. General power devices and branch circuit wiring within the space were modified to accommodate the new space configuration. We used the existing 1200-amp, 120/208 volt electrical service and main panel located on the mezzanine for the renovation.

Plumbing Engineering included design of modifications to the existing water, sanitary, storm and venting systems to accommodate the relocated or expanded restroom, kitchen, and plumbing facilities. A fire protection performance specification was prepared to relocate existing sprinkler heads to accommodate the new space configuration.

2022

Year Completed

Size

8,500 SF

Cost

Contact Us.

Tec Inc. Engineering & Design
33851 Curtis Blvd., Suite 216
Eastlake, OH 44095

Phone: (440) 953-8760

Email: info@tecinceng.com

Serving Clients Throughout Ohio
& the US. With offices in

Cleveland
Columbus

Pittsburgh

Follow Us.

  • facebook
  • instagram
  • linkedin

Newsletter Signup.
Stay connected with news, projects, and industry insights.

©2025 by Tec, Inc. Engineering & Design. 

bottom of page